I'm not sure if anyone on here does concrete work however I've had this issue since I bought my home and I'm finally sick of it. My driveway slopes down to my garage (it's a split level home) and with the concrete that has settled and cracked at the edge of my garage rain water no longer funnels into the drain and then it clogs and my garage gets filled with water. Not the end of the world but annoying as shit. There is a floor drain in the garage to alleviate the overflow Basically I want to know an estimated cost to get this repaired and if anyone recommends someone. Basically my thought is to cut 36" from the garage out. Put a nice long drain from end to end and then pour new concrete that slopes to that drain. Here's some pics for reference. The sand bags are placed at the lowest point to direct it back to the drain
__________________
'18 Silverado LT
'02 Aero Cub 21' Hybrid
Bub is online now   Reply With Quote
Old 04-09-2015, 11:57 AM   #2
 
Mook's Avatar
 
Join Date: May 2007
Location: Elgin
Posts: 159,869
Casino cash: $91130000
36.02 per day
Default

I think @LoveSpank works w/ concrete?
LoveSpank likes this.
__________________
- TCG Owner & Operator -
Mook is online now   Reply With Quote
Old 04-09-2015, 12:25 PM   #3
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

This is relevant to my interests as I have a similar issue.
EmersonHart13 is offline   Reply With Quote
Old 04-09-2015, 01:59 PM   #4
 
Angus's Avatar
 
Join Date: Oct 2007
Location: Bentonville, Arkansas
Posts: 11,597
Casino cash: $18269814
2.70 per day
Default

Could just lift up that part of the concrete alleviate your issue? Maybe it's called leveling... where they pump something under the concrete to lift it up.
__________________
2006 Saab 9-3 2.0T
And a minivan....
Angus is online now   Reply With Quote
Old 04-09-2015, 02:10 PM   #5
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

EmersonHart13 is offline   Reply With Quote
Old 04-09-2015, 03:11 PM   #6
 
Angus's Avatar
 
Join Date: Oct 2007
Location: Bentonville, Arkansas
Posts: 11,597
Casino cash: $18269814
2.70 per day
Default

exactly.
Angus is online now   Reply With Quote
Old 04-09-2015, 04:03 PM   #7
I eat dirt
 
ilikemtb999's Avatar
 
Join Date: Oct 2007
Location: Denver, CO
Posts: 68,406
Casino cash: $30213000
15.97 per day
Default

concrete/slab jacking.
__________________
85 blazer.........turbo, 1 ton axles, some stuff
70 Buick GS.......resurrection in progress
10 Tahoe SSV lowered Baja edition
14 Caprice PPV woop woop
ilikemtb999 is online now   Reply With Quote
Old 04-09-2015, 04:42 PM   #8
Slowest 3v in the Chi!
 
Teege24's Avatar
 
Join Date: Aug 2011
Location: Cary
Posts: 2,622
Casino cash: $11629300
0.91 per day
Default

my dad has been doing concrete for 32 years and he said whoever did this installed the wrong drain...you need a grated trench drain...you would need to tear that whole slab out install the drain and poor around it....
__________________
Retired
Teege24 is offline   Reply With Quote
Old 04-10-2015, 09:18 AM   #9
Forum Sponsor
 
importcrew's Avatar
 
Join Date: Jan 2008
Location: Hampshire
Posts: 11,946
Casino cash: $43972594
2.85 per day
Default

Quote:
Originally Posted by Angus View Post
Could just lift up that part of the concrete alleviate your issue? Maybe it's called leveling... where they pump something under the concrete to lift it up.
I believe you're referring to mud jacking. I used to do that with the draintile and foundation company I worked for years ago. From what I can see from the pics, break out all the concrete, replace the drain that's existing and replace it with the 4 inch by 4 foot drains for the entirety of the garage length (which seems like that's what you want) and make sure the existing draintile isn't clogged. Re-pour concrete.
Bub likes this.
__________________
AUTHORIZED DEALER FOR MANY MANUFACTURES INCLUDING:


Aero Precision
Fortis Manufacturing
Phase 5
2A Armaments
Many Many More



FB PAGE: https://www.facebook.com/L.B.ChicagoRetail/
importcrew is offline   Reply With Quote
Old 04-10-2015, 10:25 AM   #10
Forum Sponsor
 
daturbosix's Avatar
 
Join Date: Mar 2008
Location: Aurora
Posts: 11,526
Casino cash: $50039918
2.77 per day
Default

subscribed.

possible driveway replacement, walk around the side of house, and 1000-ish sq ft patio.
__________________
BY APPOINTMENT ONLY - 630.885.9333
daturbosix is offline   Reply With Quote
Old 04-10-2015, 11:01 AM   #11
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

EmersonHart13 is offline   Reply With Quote
Old 04-10-2015, 11:13 AM   #12
Forum Sponsor
 
importcrew's Avatar
 
Join Date: Jan 2008
Location: Hampshire
Posts: 11,946
Casino cash: $43972594
2.85 per day
Default

There's plenty of places that take clean concrete for free (pieces of concrete that does not contain bars and whatnot), and you can rent an electric jackhammer (not sure about air hammer and compressor) from Home Depot or Lowe's or Menard's, and just use a decent quality concrete to re-pour. With a couple guys (2-3 guys) it should take a few hours of work.
importcrew is offline   Reply With Quote
Old 04-10-2015, 11:28 AM   #13
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

Anyone happen to know at what point do you stop using bagged concrete and start ordering? 1 yard? I know the trucks have minimums, but having to deal with 100 bags is probably a complete PITA
Angus likes this.
EmersonHart13 is offline   Reply With Quote
Old 04-10-2015, 12:12 PM   #14
 
Shawn1112's Avatar
 
Join Date: Aug 2010
Location: Streamwood
Posts: 6,426
Casino cash: $69233300
1.97 per day
Default

Quote:
Originally Posted by importcrew View Post
There's plenty of places that take clean concrete (pieces of concrete that does not contain bars and whatnot), and you can rent an electric jackhammer (not sure about air hammer and compressor) from Home Depot or Lowe's or Menard's, and just use a decent quality concrete to re-pour. With a couple guys (2-3 guys) it should take a few hours of work.
I would rent the jack hammer from a place like Taylor Rental or similar. The ones at Home Depot and Menards are probably shit.
Shawn1112 is offline   Reply With Quote
Old 04-10-2015, 12:21 PM   #15
Forum Sponsor
 
importcrew's Avatar
 
Join Date: Jan 2008
Location: Hampshire
Posts: 11,946
Casino cash: $43972594
2.85 per day
Default

Quote:
Originally Posted by EmersonHart13 View Post
Anyone happen to know at what point do you stop using bagged concrete and start ordering? 1 yard? I know the trucks have minimums, but having to deal with 100 bags is probably a complete PITA
Most concrete places have a 3 yard minimum order and charge around $123 per yard. Every year prices go up. Those are about what prices are now for construction companies. Not sure if they charge the same price for people who don't normally order from the companies. Plus they may also charge fuel surcharge and hazardous fees.

Trying to go off that picture, kind of assuming 2 feet X 20 feet @ 6 inches deep, you're looking at about .74 cubic yards. Won't be worth ordering from a company. If it was an entire driveway, then yea. But it's a small slab. Best bet is to rent a concrete mixer or buy one (I believe about 200 - 300 dollars brand new although I'm sure you can find deals).
importcrew is offline   Reply With Quote
Old 04-10-2015, 12:23 PM   #16
Forum Sponsor
 
importcrew's Avatar
 
Join Date: Jan 2008
Location: Hampshire
Posts: 11,946
Casino cash: $43972594
2.85 per day
Default

Quote:
Originally Posted by Shawn1112 View Post
I would rent the jack hammer from a place like Taylor Rental or similar. The ones at Home Depot and Menards are probably shit.
I've used electric hammers from Home Depot a couple times. Weren't bad but with almost any electric hammers, they're not as good as air.
importcrew is offline   Reply With Quote
Old 04-10-2015, 01:33 PM   #17
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

Quote:
Originally Posted by importcrew View Post
Most concrete places have a 3 yard minimum order and charge around $123 per yard. Every year prices go up. Those are about what prices are now for construction companies. Not sure if they charge the same price for people who don't normally order from the companies. Plus they may also charge fuel surcharge and hazardous fees.

Trying to go off that picture, kind of assuming 2 feet X 20 feet @ 6 inches deep, you're looking at about .74 cubic yards. Won't be worth ordering from a company. If it was an entire driveway, then yea. But it's a small slab. Best bet is to rent a concrete mixer or buy one (I believe about 200 - 300 dollars brand new although I'm sure you can find deals).
I need to have the front of my garage, where the door sits, re done because the garage settled in the middle and the door doesn't seal right. It is like 16' x 3' so it isn't much concrete. Thanks!
EmersonHart13 is offline   Reply With Quote
Old 04-10-2015, 01:36 PM   #18
JTICE
 
LoveSpank's Avatar
 
Join Date: Mar 2012
Location: bolingbrook
Posts: 5,042
Casino cash: $49583600
1.88 per day
Default

OK DONT do concrete jackingm its a joke in More ways then one!! As it may be cheaper to do bag mix at times, I am a firm believer in always using redimix trucks for several reasons - one being all concrete is mixed consistently and its less mess hassle and if u happen to get shit concrete most redi mix companies warranty there product. Also keep in mind if a job calls for 1 yard rule of thumb is to always order 25-50% more then measured for... Air Air Air the electronic hammers have no balls or weight yes might be more for rental but twice to three times faster ..

Where r u located and fro. What I see in the pics I would install a drain the length of the drive and that would eliminate all issues
__________________
SHOCKERRACING
LoveSpank is offline   Reply With Quote
Old 04-10-2015, 01:38 PM   #19
JTICE
 
LoveSpank's Avatar
 
Join Date: Mar 2012
Location: bolingbrook
Posts: 5,042
Casino cash: $49583600
1.88 per day
Default

I do concrete on all levels ask me anything
LoveSpank is offline   Reply With Quote
Old 04-10-2015, 02:11 PM   #20
Bub
Pitter Patter
 
Bub's Avatar
 
Join Date: Sep 2012
Location: Pistakee Highlands
Posts: 12,139
Casino cash: $13764643
4.84 per day
Default

I'm just north of fox lake. Unincorporated Johnsburg
Bub is online now   Reply With Quote
Old 04-10-2015, 02:29 PM   #21
Forum Sponsor
 
importcrew's Avatar
 
Join Date: Jan 2008
Location: Hampshire
Posts: 11,946
Casino cash: $43972594
2.85 per day
Default

Quote:
Originally Posted by LoveSpank View Post
OK DONT do concrete jackingm its a joke in More ways then one!! As it may be cheaper to do bag mix at times, I am a firm believer in always using redimix trucks for several reasons - one being all concrete is mixed consistently and its less mess hassle and if u happen to get shit concrete most redi mix companies warranty there product. Also keep in mind if a job calls for 1 yard rule of thumb is to always order 25-50% more then measured for... Air Air Air the electronic hammers have no balls or weight yes might be more for rental but twice to three times faster ..

Where r u located and fro. What I see in the pics I would install a drain the length of the drive and that would eliminate all issues
For a small job it isn't worth ordering a truck that's less than 2.5 yards. Unless you can get it per yard with no minimum, you're gonna have to spend extra money than needed. Especially since prices rise every year for ordering with concrete trucks. That's at least the case with Ozinga, and Super Mix. Air hammers will always be better and quicker. But if you're not trying to spend to much, an electric hammer will suffice for a small job. I've used electric hammers for many jobs but yea, it'll take longer to break. Especially depending on the thickness of the concrete. But if somebody is willing to spend for the rental of an air compressor and air hammer, then it'll be quicker.

Just be sure to wear eyes and ears. Also mask preferably as there's plenty of dust.
EmersonHart13 and rocket5979 like this.
importcrew is offline   Reply With Quote
Old 04-10-2015, 02:29 PM   #22
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

Quote:
Originally Posted by LoveSpank View Post
OK DONT do concrete jackingm its a joke in More ways then one!! As it may be cheaper to do bag mix at times, I am a firm believer in always using redimix trucks for several reasons - one being all concrete is mixed consistently and its less mess hassle and if u happen to get shit concrete most redi mix companies warranty there product. Also keep in mind if a job calls for 1 yard rule of thumb is to always order 25-50% more then measured for... Air Air Air the electronic hammers have no balls or weight yes might be more for rental but twice to three times faster ..

Where r u located and fro. What I see in the pics I would install a drain the length of the drive and that would eliminate all issues
So when you need 3/4 of a yard for a project do you buy and pay for 3 yds then and just eat the rest?
rocket5979 likes this.
EmersonHart13 is offline   Reply With Quote
Old 04-10-2015, 02:31 PM   #23
Forum Sponsor
 
importcrew's Avatar
 
Join Date: Jan 2008
Location: Hampshire
Posts: 11,946
Casino cash: $43972594
2.85 per day
Default

Quote:
Originally Posted by EmersonHart13 View Post
I need to have the front of my garage, where the door sits, re done because the garage settled in the middle and the door doesn't seal right. It is like 16' x 3' so it isn't much concrete. Thanks!
How uneven is it? Is it possible to use a different/larger kind of weatherstrip on the bottom of the garage door or even use a self leveling concrete mix and just even out the floor a bit? How much settling is there on the floor? Just the front of the garage (by the garage door) or the entire garage slab?

Also, even with 3/4 of a yard, I'd say at least get 1 yard. Doing bag mixes, buy extra. You can always take some back if you don't need it.
importcrew is offline   Reply With Quote
Old 04-10-2015, 02:34 PM   #24
Chevy Humper
 
EmersonHart13's Avatar
 
Join Date: Jul 2007
Posts: 44,913
Casino cash: $53335000
10.25 per day
Default

Just the front of the slab, it evens back out within 2 feet. The cliff, as I like to call it, occurs twice and is around 3/4"ish but I haven't measured it.

I put a fresh strip on the bottom and it helped but there is still a visible gap because it is a sharp transition. I suppose that self leveling concrete could work as well. I just questioned how well it would stay there being driven over every day.
EmersonHart13 is offline   Reply With Quote
Old 04-10-2015, 02:43 PM   #25
Gearhead
 
rocket5979's Avatar
 
Join Date: Nov 2005
Location: Round Lake, IL
Posts: 6,575
Casino cash: $7257600
1.32 per day
Default

Quote:
Originally Posted by LoveSpank View Post
OK DONT do concrete jackingm its a joke in More ways then one!! As it may be cheaper to do bag mix at times, I am a firm believer in always using redimix trucks for several reasons - one being all concrete is mixed consistently and its less mess hassle and if u happen to get shit concrete most redi mix companies warranty there product. Also keep in mind if a job calls for 1 yard rule of thumb is to always order 25-50% more then measured for... Air Air Air the electronic hammers have no balls or weight yes might be more for rental but twice to three times faster ..

Where r u located and fro. What I see in the pics I would install a drain the length of the drive and that would eliminate all issues


Holy crap a 50% waste factor is huge! That's a lot of wasted money on a big job! Usually 10% is the better area to be if your estimators are good at their volume computations.

Doing less than 1 CY is just not worth it to order from a TM, especially considering the OP's final mix volume may end up closer to .5 CY once the drain trench volume is taken into account. If this ends up being a DIY I suggest keeping it simple and mixing some bags of crete together in a wheelbarrow with a hoe and placing by hand; assuming you can get those bags for a decent price. If there is some sort of a slope needed, then a stringline, line level, and tape can be used to get things eye-balled.
__________________
-Robert-
2009 Pontiac G8 GT 6.6-Twin Turbo, 402 stroker, built trans, fuel system, etc...
2005 Audi S4 4.2-Boltons...
2003 Explorer XLT 4.6-Kenne Bell 2.2 @20psi, Built 4.6, built 4R70W, fuel system, etc...

rocket5979 is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 11:07 AM.


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.6.0
User Alert System provided by Advanced User Tagging v3.0.6 (Lite) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
no new posts