follow_along_with_video_below_to_see_how_to_install_our_site_as_web_app
Note: this_feature_currently_requires_accessing_site_using_safari
i was about to give you a whole lot shit mr! lolOk Christ, I was going to say ?
i was about to give you a whole lot shit mr! lol
Are you the Z06? Sure sounds different.
Yeah, that might be a bit too big. I still say it's over 5.5, the 5.5 rumor has been around forever because of the IMSA class limit. GM likes their displacement and with the Z06 most likely staying NA, I don't see them making a smaller motor.
He meant staying NA this generation rather than going forced induction route of the C7.
Welcome to Detroit...
Yikes, Someone Stole the Wheels off This C8 Corvette
The poor thing is now resting on cinderblocks on a street in Detroit.www.caranddriver.com
You might have a point there.
J-LO, you have a build date or status number yet?
1000 Order On Hold at Dealership
1100 Order Placed at Dealership
1101 Order Entered into System
1102 Order Entered via Web
2000 Order Accepted by Chevrolet
2001 Order Generated to Dealer
2005 Order Replaced with GM Prospec Order
2030 Order Edited by Chevrolet
2050 Order Changed
2500 Order Preferenced (or "Picked Up" or "Imaged"), Sent to Production
3000 Order Accepted by Production Control
3100 Order Available to Sequence (now becomes more stable)
3300 Order Selected and Scheduled for Production by Assembly Plant (Target Production Week usually available now)
3400 Order Broadcasted for Production (Internal Plant Order Produced)
3800 Vehicle Produced
4000 Vehicle Available to Ship
4104 Bailment Invoice Created
4B00 Bayed ("B", not 8)
4106 Bailment Released
4150 Vehicle Invoiced (Dealer Billed)
4200 Vehicle Shipped
4300 Intermediate Delivery
4V03 Estimated Delivery Date
4800 Rail Ramp Unload
5000 Vehicle Delivered to Dealer
6000 Vehicle Delivered to Customer
9000 Order Cancelled