Did a menards build a deck project.
It's waaaayy fucking over kill for beams and support but I printed the design and am sticking to it. So far the only thing I changed was the 12x48 columns. I cut them bitches in half and only dug 24-30 inches so we'll use half the concrete. Not worried one bit about strength or frost line.
It's waaaayy fucking over kill for beams and support but I printed the design and am sticking to it. So far the only thing I changed was the 12x48 columns. I cut them bitches in half and only dug 24-30 inches so we'll use half the concrete. Not worried one bit about strength or frost line.