so I managed to do some work on the L and I'm almost done! hopefully will be done by the SpeedInc open house on the 26th, but here's all I managed to do:
-6lber/tune (you can see numbers in my other thread)
-meth injection
-250amp alternator
-LFP efan
-LFP idlers
-LFP drive shaft loop
-L&S separator (threw out the plastic tubing it came with and used fuel line for everything)
-TVS
-line lock
-braided brake lines
-bassani catback/mids
-waititng for bedrug/new bed cover
-waiting for new hood
-wideband/headers going on april 9th
-WAITING FOR BOYDS!!!!!! kinda angry about these... 14weeks later and still not here, I was told the company I ordered them from has an ETA of april 20th so I should see them the week of 21st
-ported blower going on late april/may
I'll post up some pics later
-6lber/tune (you can see numbers in my other thread)
-meth injection
-250amp alternator
-LFP efan
-LFP idlers
-LFP drive shaft loop
-L&S separator (threw out the plastic tubing it came with and used fuel line for everything)
-TVS
-line lock
-braided brake lines
-bassani catback/mids
-waititng for bedrug/new bed cover
-waiting for new hood
-wideband/headers going on april 9th
-WAITING FOR BOYDS!!!!!! kinda angry about these... 14weeks later and still not here, I was told the company I ordered them from has an ETA of april 20th so I should see them the week of 21st
-ported blower going on late april/may
I'll post up some pics later